Assignments
- The client’s objective was to automate the filling process of products in intermediate bulk containers (IBCs).
- Reduce the time of the operators when filling the IBCs.
- Reduce product spillage.
Solutions
- Saen Engineering was selected to provide the electrical and mechanical engineering of this project.
- The required components, such as the load cells, valves and pumps, were selected by Saen Engineering.
- Electrical and mechanical installation of all components.
Results
- The IBCs were no longer overfilled.
- Operator satisfaction increased.
- No more product spills.
- Easy to clean design with quick connections.
- Saving of one FTE.
- We provided documentation, reports and operator training.