Assignments
- The client’s objective was to improve the air quality in one of their assembly halls
- Separating the assembly hall and the welding hall by using a fast-fold door.
- The crane had to be able to run under the folded fast-fold door.
Solutions
- Saen Engineering was selected to provide the mechanical and electrical engineering and installation.
- Saen Engineering designed 2x 200kg fast-fold doors each measuring 12 meters wide and 8 meters high.
- Mechanical stress analyses were performed to ensure the strength of the components.
- A motor drives a shaft of 30 meters. The shaft rolls up straps, which cause the doors to fold.
Results
- No more smoke in the assembly hall.
- 2x 200kg fast-fold doors, controlled from an operator panel.