Assignments
- Project management, supervision, engineering, fabrication and installation of a 1200mm / 48″ modular pipe extrusion plant.
- Installation and commissioning of the plants in different parts, China, Germany and in the USA.
- The timing of this project was crucial, as the client had already contracted to supply pipes to multiple customers.
Solutions
- Saen Engineering provided electrical engineering, mechanical engineering, and project management of the the pipe extrusion plant and roller conveyors.
- The project included plant design in skid form, site layout design, and the mechanical and electrical engineering and installation of machinery, for both plant and utilities.
- Mechanical stress analyses were done to ensure the strength of the components and skids.
- We supervised twenty technicians, ensured a high quality installation and provided the project with the required documentation.
Results
- Saen Engineering involved multiple stakeholders to ensure the best quality of work.
- Multiple machines were placed on the skids in China and shipped to the USA.
- Multiple months of project management took place on-site to commission the world’s first 1200mm skid pipe extrusion.
- Documentation and reports were delivered and an operator training took place.